| 1. | Beginning on 29 September 1910 her boiler tubes were renewed at Cherbourg.
|
| 2. | The boilers were a conventional type with round-topped boiler tubes, in diameter.
|
| 3. | Some of the first boiler tubes, particularly the scale internally.
|
| 4. | The shorter overall length meant that the boiler tubes were shorter, which also improved draughting.
|
| 5. | Other important area of concern as far as Silica deposition is concerned is boiler tube.
|
| 6. | This caused air to be fed into the horizontal boiler tube probably caused the priming.
|
| 7. | While in refit, fire gutted the wheelhouse and boiler tubes burst later during speed trials.
|
| 8. | "Cattistock " steamed to Portsmouth for boiler tube replacement.
|
| 9. | A steel pipe or " boiler tube " pilot replaced the original wooden type of cowcatcher.
|
| 10. | The class also suffered from leaking boiler tubes after passing over points, which necessitated structural reinforcement.
|