| 11. | Air Traffic Controllers will sequence aircraft making instrument approaches with regard to these minima.
|
| 12. | Outside radar environments, the instrument approach starts at the IAF.
|
| 13. | In general, each specific instrument approach specifies the minimum weather conditions to permit landing.
|
| 14. | Future upgrades include the addition of runway lighting and an enhanced instrument approach procedure.
|
| 15. | In 2010, Golden Bay Air commissioned an GNSS instrument approach system at Takaka Aerodrome.
|
| 16. | While attempting an instrument approach to Dubrovnik Airport, the airplane crashed into a mountainside.
|
| 17. | It is a major airfield with a runway, instrument approach facilities, and nighttime illumination.
|
| 18. | Both Runways 2 and 20 have non-precision instrument approaches.
|
| 19. | One account states that it was on instrument approach.
|
| 20. | Pilots most frequently get task-saturated when flying instrument approaches, especially in actual instrument meteorological conditions.
|