| 11. | The old runway 15 / 33 was converted into a taxiway.
|
| 12. | The runway, taxiways and the tarmac were expanded and improved.
|
| 13. | Concrete taxiways were added during the B . E . A.
|
| 14. | A parallel asphalt taxiway and a few connector taxiways were added.
|
| 15. | A parallel asphalt taxiway and a few connector taxiways were added.
|
| 16. | This taxiway connects the terminal building with Runways 18 and 25.
|
| 17. | Many taxiways to the new runway were rebuilt during the construction.
|
| 18. | The airport has a taxiway and a de-icing platform.
|
| 19. | The apron and taxiway was repaved in the spring of 2007.
|
| 20. | A connecting taxiway in the corporate hangar area was also constructed.
|