| 31. | The track has been relaid since then and has passed several tests along the way.
|
| 32. | The granite setts which form the approach ramps were taken up and relaid in 1978.
|
| 33. | From 1913, the railways were relaid with 14 platform tracks at a higher level.
|
| 34. | The line was relaid next to the old line towards Peitz as far as Willmersdorf.
|
| 35. | The floors in the nave were relaid at a lower level and refloored in stone.
|
| 36. | A few have been relaid as narrow-gauge but the majority are standard-gauge.
|
| 37. | The line to Bangor was relaid.
|
| 38. | Replica tram cars were built, tracks were relaid and service recommenced on 14 June 1986.
|
| 39. | The railway was expanded and much of the old track was relaid with heavy steel rails.
|
| 40. | Following the inquiry, much of the track was relaid and the train scheduling was altered.
|