| 31. | A new dual carriageway relief road, the Port Talbot Peripheral Distribution Road ( PDR ), was completed in 2013.
|
| 32. | The route no longer runs through Castlebar town centre in any case, having been bypassed by a relief road.
|
| 33. | Construction of a relief road through the village began in October 1977 and the road opened in December 1978.
|
| 34. | The relief road originally planned for the B 3, called the " Berliner Ring ", is open in parts.
|
| 35. | This park land is being reduced in size by the Cathkin Relief Road project which is currently under construction.
|
| 36. | The relief road was built to ease heavy traffic that once travelled through the narrow main streets of the village.
|
| 37. | The A507 Ridgmont relief road is designed to carry 80 per cent of heavy traffic away from the neighbouring villages.
|
| 38. | The South Woodford to Barking Relief Road ( the section between the A13 Newham Way / Alfred's Way in Beckton.
|
| 39. | Following the construction of the relief road, the Basingstoke Canal now crosses the River Blackwater via the spectacular Ash Aqueduct.
|
| 40. | The M4 is planned to have a relief road built and managed in the same way as the M6 Toll.
|