| 31. | Route 25 continues northward as a surface road following Main Street into Brookfield.
|
| 32. | It is an undivided two-lane surface road for its entire length.
|
| 33. | Swarupnagar CD Block had 94 km surfaced roads and 190 km unsurfaced roads.
|
| 34. | Deganga CD Block had 331 km surfaced roads and 184 km unsurfaced roads.
|
| 35. | Barasat II CD Block had 230 km surfaced roads and 18 km unsurfaced roads.
|
| 36. | Habra I CD Block had 169 km surfaced roads and 112 km unsurfaced roads.
|
| 37. | Barrackpore I CD Block had 45 km surfaced roads and 28 km unsurfaced roads.
|
| 38. | Basirhat I CD Block had 80 km surfaced roads and 143 km unsurfaced roads.
|
| 39. | Barrackpore II CD Block had 68 km surfaced roads and 360 km unsurfaced roads.
|
| 40. | Some cars traveling surface roads beneath those sections were crushed.
|