The post-war era led to massive demand for electrical systems, leading to additional rivalries between Metrovick and BTH as each attempted to one-up the other in delivering ever-larger turbogenerator contracts.
32.
Three turbines were delivered by Brown Boveri in 1939 to Arkhangelsk for the " Sovetskaya Rossiya ", but the Kharkhovskii Turbogenerator Works never completed a single turbine before the German invasion in June 1941.
33.
The plant uses two Alstom GT26 gas turbines, each driving an air-cooled turbogenerator, with a heat recovery steam generator powering a single STF30C steam turbine which also drives another air-cooled turbogenerator.
34.
The plant uses two Alstom GT26 gas turbines, each driving an air-cooled turbogenerator, with a heat recovery steam generator powering a single STF30C steam turbine which also drives another air-cooled turbogenerator.
35.
Today its core business is centred on the manufacture of medium-sized four pole turbo-generators ( Brush Turbogenerator Division centre of excellence ), AC traction motors and service and repair of electrical machines.
36.
The 1969-built Canadian polar icebreaker CCGS " Louis S . St-Laurent " was one of the few icebreakers fitted with steam boilers and turbogenerators that produced power for three electric propulsion motors.
37.
The tailrods were soon removed, as they were on other PRR classes that had them, and the oil headlights were replaced by electric units and turbogenerators, the latter sited between the headlamp and the stack.
38.
Citterio is not the only one who has fallen in love with the Capstone turbogenerator, which produces 30 kilowatts of electricity _ enough to power a small restaurant or a convenience store _ hot air and virtually no pollutants.
39.
"Revenue growth in 2000 will come from continued strength in the aerospace aftermarket and turbochargers; improvements in industrial control, specialty chemicals and polymers businesses; and new products in turbogenerators and chip packaging, " he said.
40.
In case of a coolant circuit failure with simultaneous loss of external power, the essential power can be supplied by the spinning down turbogenerators for about 45 50 seconds, during which time the diesel generators should start up.