The left bank underground power station houses reversible Francis-pump turbines for pumped-storage operation and the right bank semi under ground power station houses Francis-turbine generators.
32.
Water from the upper reservoir is sent to the 1, 200 MW underground power station down near the lower reservoir through headrace / penstock pipes.
33.
After passing through the dam and sand traps, water from the reservoir is fed into a long tunnel, which leads to the underground power station.
34.
An intake tower is located in the weir, which directs water down a tunnel to the turbines in an underground power station below Tully Falls.
35.
The dam supplies water to an underground power station capable of generating 234 MW from three 78 MW generators, producing about 359 million KWh each year.
36.
The water is drawn from the penstocks of Kolkewadi Dam to an underground power station in the 3rd stage and then discharged to the Arabian Sea.
37.
From there, a tunnel takes water to Loch Beinn a'Mheadhoinn ( Loch Benevean ) in Glen Affric, via a small underground power station near Mullardoch dam.
38.
Water from the upper reservoir is sent to the 1, 000 MW underground power station down near the lower reservoir through two long headrace / penstock pipes.
39.
Water from the upper reservoir is sent to the 1, 200 MW underground power station down near the lower reservoir through four long headrace / penstock pipes.
40.
Before each of the headrace tunnels from the H�lsl�n reservoir or Ufsarl�n pond reach the underground power station, they both join to form a single combined headrace tunnel.