| 41. | This requires using an odd number of datum points in the sample window.
|
| 42. | The datums should be functional per the ASME standard.
|
| 43. | So, the functional datums are chosen based on how the part attaches.
|
| 44. | The primary datum controls the most degrees of freedom.
|
| 45. | The tertiary datum controls the least degrees of freedom.
|
| 46. | They even ask tourists for using the SAD69 Datum.
|
| 47. | This datum was imprecise and should be considered outdated.
|
| 48. | Elementary receptacle for a datum which is associated with a single Record Type.
|
| 49. | Below is an example of a datum shift operation in WKT 2 format.
|
| 50. | The lateral reference datum is usually located at the center of the helicopter.
|