It is proposed over an area of about 40.5 km 2 ( 10000 acres ) in Bhubaneswar in the region ecompassing Infocity-I and Infocity-II . The Detailed Project Report ( DPR ) is being prepared by IL & FS Infrastructures Ltd in collaboration with the state-owned Industrial Infrastructure Development Corp ( IDCO ).
42.
The detailed engineering study for the project was carried out by Wilbur Smith Associates Inc . ( WSA ) during 1998-99 . Detailed traffic analysis and forecast for the road was carried out by WSA in 1998 as part of the detailed engineering and design of the JVLR . A detailed project report was prepared by Wilbur Smith Associates in 1998.
43.
On 15 June 2015, the MMRDA announced that it would implement Line 2 of the metro in three parts-Dahisar East-DN Nagar ( Metro 2A ), DN Nagar-BKC ( Metro 2B ), and BKC-Mankhurd ( Metro 2C ), and also appointed the DMRC to conduct a feasibility study and detailed project report for the line.
44.
The completion period for NW-4 was estimated at seven years by Detailed Project Report prepared by WAPCOS, which is contrary to that of 2002 estimates which indicated five years as completion period . of land are required for NW-4 construction;,, and land has to be acquired in the states of Tamil Nadu, Andhra Pradesh, and Puducherry respectively.
45.
There is proposal by Tamil Nadu Highways Department, under Rural Road Scheme, NABARD, having its office in chengalpattu, to construct road over bridge across at Railway Level Crossing No . 7 at 17 / 34-18 / 2 in between Ambattur and Avadi ( Near Annanur Railway Station ) Detailed Project Report is prepared by The ALPS INCORPORATION Chennai . which will connect to Chennai Bypass, Outer Ring Road, NH . 4