| 41. | The power plant is located at an elevation of and contains two 180 MW Francis turbine-generators.
|
| 42. | Reversible turbine-generator assemblies act as both a pump and turbine ( usually a Francis turbine design ).
|
| 43. | It was an evolution of the Francis turbine but revolutionized the ability to develop low-head hydro sites.
|
| 44. | The unit, which is equipped with a francis turbine, was first synchronized on December 12, 1980.
|
| 45. | The Khara Power Station contains three 24 MW Francis turbine-generators and a has a net head of.
|
| 46. | The power plant has six vertical Francis turbines, with a nominal power of each, which rotate at.
|
| 47. | The water is used to turn five Vertical Francis turbines, revolving at a higher speed of 187 rpm.
|
| 48. | A penstock takes water downstream to the twin-Francis turbine power station, for a rated head of.
|
| 49. | Palnadu Sagar spillway with Francis Turbine will release water into Nagarjuna Sagar right canal along with Hydroelectricity power generation.
|
| 50. | While only 3 are currently operational, the power station will contain 7 324 MW reversible Francis turbine generators.
|