| 1. | Several trips were made by breakdown trains to the derailment site.
|
| 2. | It ended up on Breakdown train at Dynon in the 1980s.
|
| 3. | It is known that number 12 was part of the Melton Constable breakdown train.
|
| 4. | An additional breakdown train was sent to the crash site from Toowoomba at 10am.
|
| 5. | In reality, that headcode would normally only have been used for a breakdown train.
|
| 6. | A breakdown train was also located at Stratford and its staff lived in nearby company owned flats.
|
| 7. | The most important units are breakdown trains ( for re-railing derailed rolling stock ) and rotary snow ploughs.
|
| 8. | Around the same time 34ZH was allocated to the Ballarat breakdown train ., until it was withdrawn in November of 1956.
|
| 9. | A breakdown gang was sent from Toowoomba and breakdown trains were also despatched from Brisbane and Toowoomba to clear wreckage from the line.
|
| 10. | The engine propelled by 226 tons ( 230 tonnes ) of combined weight behind its tender collided with the rear of the breakdown train.
|