| 1. | Steel sheet piles were driven into the bed around the cofferdam.
|
| 2. | This sheet piling way raised the height of the dam again.
|
| 3. | Some of new channel was constructed, some of it edged with sheet piling.
|
| 4. | Sheet piles were driven into the ground from July 2014 and then further construction started.
|
| 5. | Larssen sheet piling was used at the rear of the quays, with a tipped chalk bank behind.
|
| 6. | In addition, the west pier was lengthened by by the addition of a cellular sheet pile extension.
|
| 7. | The engineers built a rectangular frame of sheet piling that was driven by a lever activated ram.
|
| 8. | The NSW State Government committed 2.9 million to the restoration of the sheet piling on the banks of the river.
|
| 9. | Sheet piling blocks water flow into the 17th Street Canal, making closure of the breach not relevant to city flooding.
|
| 10. | Sand bags were brought in and a sheet pile closure structure was built across the London Avenue Canal on September 3, 2005.
|