| 1. | In this process the material for the core and face sheet is the same.
|
| 2. | There is also a risk of melting the face sheets.
|
| 3. | For in-situ bonded face sheets the core is closed-cell foam.
|
| 4. | A foamable precursor is expanded between two face sheets.
|
| 5. | It is a " honeycomb core surrounded by a carbon fiber face sheet plies ."
|
| 6. | This sandwich-compact assembly goes through several rolling steps to attain desired precursor and face sheet thickness.
|
| 7. | Face sheets are chosen from a variety of aluminium alloy, and other metals such as steel.
|
| 8. | The outer structure was made of stainless steel brazed honeycomb brazed between steel alloy face sheets.
|
| 9. | When the liquid foam comes in contact with the solid face sheets a metallic bond is established.
|
| 10. | The last time the Angels faced Sheets was the final spring-training game in Arizona on March 28.
|