| 1. | The dam measures in length, with an overfall area that is long.
|
| 2. | The overfall weir became redundant when the Tongue End pumping station was constructed in 1966.
|
| 3. | The central portion is an overfall spillway.
|
| 4. | There is a granite-lined overfall area long, which was originally topped by flashboards.
|
| 5. | The DAM at the Croton River is 40 feet high, and the overfall 251 feet in length.
|
| 6. | The overfall area is topped with cut granite, and originally had wooden flashboards held in by pins.
|
| 7. | The maximum height of masonry above rock is 82 feet and the overfall at the spillway, 61 feet.
|
| 8. | There can be a substantial overfall here and in a south east wind can be extremely challenging for the kayaker.
|
| 9. | Until 2011, the major outflow from the pond was an overfall in the extreme southern corner of the pond.
|
| 10. | The masonry has a maximum height of 82 feet above rock and the overfall at the spillway is 61 feet.
|